Complexities/Challenges
This project was run through a commercial builder and partner. The main challenge was transporting the oversized load through the CBD and craning the materials up after hours in the early morning. Another complexity was meeting the code for the box gutter fall installation due to the existing steelwork and the need to utilise the existing stormwater system. Because of the low pitch of the roof, we used .48BMT Prodeck sheeting with a 50mm high rib. This profile offers excellent water-carrying capacity and superior spanning ability, which gave us the advantage with all the internal structure challenges to maximise leak prevention.
Highlights
The highlight of this project was selecting a product best suited to the building’s needs and challenges. Our skilled supervisor navigated daily complexities, maintained safety standards, and worked closely with the team to provide onsite training and upskilling opportunities with this unique installation.