Complexities/Challenges
All the box gutter lining and hangers had to be removed to accommodate the installation of new stormwater. We installed box gutters and sumps with adequate falls to stormwater outlets. We core drilled tilt panel walls and installed additional overflow relief. All these works were implemented to ensure adequate roof drainage, as the building had been leaking for several years with minor repairs unable to prevent water ingress. All designs were hand drawn and laminated to ensure all team members could easily access the documentation and ensure correct installation.
Highlights
This design was constructed by the Director, Tyson McErvale, and the highlight was that we were able to service this private commercial project to remedy poor workmanship and design faults with his new designs. From installing our own edge protection to the crane lifts, roof insulation, and site clean, this project was completed within 14 working days. Since then, we have successfully completed three other smaller residential roofs for this client.